Stocks & stats Back
En Ru
  • Gold (USD) 1,246.10 +4.50
  • MOEX (RUB) 4,369.00 -5.00
  • OTC (USD) 29.59 0.00
1,763 koz of gold
produced in 2015 (2014: 1,696 koz)
424 $/oz
Total cash cost
610 $/oz
All-in sustaining cash cost
Ore processed, kt
22,743 2014
24,740 2015
Adj. EBITDA $ mln
1,011 2014
1,268 2015
6 6 operating assets: 5 hard-rock mines and alluvial operations
2,189 $ mln
Total Revenue in 2015
0.08
Lost time injury frequency rate (LTIFR) per 200k hours worked in 2015 (2014: 0.09)
Factsheet
Titimukhta
Krasnoyarsk region, Eastern Siberia, Russia
Mining type

Conventional shovel-and-truck open-pit operation

2015 production
2014 production
2.4 mtpaProcessing capacity
1.3 millionProven and Probable Reserves (ounces)
1.8 millionMeasured, Indicated an Inferred Mineral Resources (ounces)
561Employees

Titimukhta is a medium-sized operation, located in close proximity to Olimpiada, Polyus largest mine. Titimukhta was commissioned in 2009. In May 2012, Polyus completed an expansion programme which increased the mine throughput to 2.4 mln tonnes of ore per year. Following the completion of the Titimukhta Mill reconfiguration project in September 2016, mining and processing activities at Titimukhta have been idled in favour of treating Olimpiada ores.