Stocks & stats Back
En Ru
  • Gold (USD) 1,351.45 +9.35
  • MOEX (RUB) 3,775.00 +57.00
  • LSE (USD) 30.85 +0.70
2,160 koz of gold
produced in 2017 (2016: 1,968 koz)
364 $/oz
Total cash cost per ounce sold
621 $/oz
All-in sustaining cash cost
Ore processed, kt
26,445 2016
28,663 2017
Adj. EBITDA $ mln
1,536 2016
1,702 2017
5 5 operating assets: 4 hard-rock mines and alluvial operations
2,721 $ mln
Total Revenue in 2017
0.10
Lost time injury frequency rate (LTIFR) per 200k hours worked in 2017 (2016: 0.13)
Factsheet

Reserves and resources

Reserves and resources

Polyus reports its reserves and resources in accordance with the JORC Code (2004 and 2012 where applicable).

Polyus Ore Reserve estimates as at 31 December 20171

Deposit2 Proved Probable Total
Tonnes
(Mt)
Gold
(g/t)
Gold
(Moz)
Tonnes
(Mt)
Gold
(g/t)
Gold
(Moz)
Tonnes
(Mt)
Gold
(g/t)
Gold
(Moz)
Mines in Operation
Olimpiada 6.5 2.9 0.6 288 2.9 27 295 2.9 28
Blagodatnoye 52 0.9 1.6 164 1.5 8.0 216 1.4 9.6
Titimukhta 5.3 1.6 0.3 6.3 3.1 0.6 12 2.4 0.9
Verninskoye 12 1.3 0.5 82 1.7 4.6 94 1.7 5.1
Alluvials3 0.0 0.0 0.0 87 0.3 1.0 87 0.3 1.0
Kuranakh 0.0 0.0 0.0 141 1.0 4.4 141 1.0 4.4
Natalka 146 1.5 7.3 146 1.8 8.5 293 1.7 16
Development and Exploration Projects
Chertovo
Koryto
0 0.0 0.0 62 1.5 3.1 62 1.5 3.1
Total4 222 1.4 10.2 976 1.8 57 1 ,199 1.8 68

Polyus Mineral Resource estimates as at 31 December 2017

Deposit2 Measured Indicated Inferred Total
Tonnes
(Mt)
Grade
(g/t)
Gold
(Moz)
Tonnes
(Mt)
Grade
(g/t)
Gold
(Moz)
Tonnes
(Mt)
Grade
(g/t)
Gold
(Moz)
Tonnes
(Mt)
Grade
(g/t)
Gold
(Moz)
Mines in Operation
Olimpiada 6.5 2.9 0.6 320 3.0 31 127 2.8 12 454 3.0 44
Blagodatnoye 52 0.9 1.6 292 1.5 14 69 1.3 3.0 413 1.4 19
Titimukhta 5.3 1.6 0.3 6.3 3.1 0.6 0.5 1.5 0.03 12 2.4 0.9
Verninskoye 12 1.3 0.5 209 1.6 11 14 2.0 0.9 234 1.6 12
Alluvials3 0 0.0 0.0 224 0.2 1.4 34 0.4 0.4 258 0.2 1.9
Kuranakh 0.0 0.0 0.0 153 1.1 5.4 97 1.2 3.7 250 1.1 9.1
Natalka 150 1.7 8.2 261 1.8 15 148 2.1 9.9 558 1.9 34
Development and Exploration Projects
Sukhoi Log5 0 0.0 0 0 0.0 0 887 2.0 58 887 2.0 58
Panimba 5.0 2.3 0.4 11 2.3 0.8 24 1.8 1.4 40 2.0 2.6
Poputninskoye 0 0.0 0 37 3.2 3.9 4.4 2.9 0.4 42 3.2 4.3
Zmeinoye 0 0.0 0 0.9 5.0 0.1 2.0 4.5 0.3 2.9 4.6 0.4
Chertovo Koryto 0 0.0 0 67 1.5 3.3 7.8 1.3 0.3 75 1.5 3.6
Bamskoye 0 0.0 0 15 1.8 0.9 5.1 1.6 0.3 20 1.8 1.1
Medvezhy 0 0.0 0 0 0.0 0 6.5 1.8 0.4 6.5 1.8 0.4
Total4 231 1.5 11 1, 596 1.7 88 1, 426 2.0 91 3, 252 1.8 190


1 using a gold price assumption of US$1,250/oz

2 the estimates for all deposits are presented on a 100% basis

3 for the Alluvials, cubic metres (m3) have been converted to tonnages using the general bulk density factor of 1,85 t/m3 strictly for the purpose of the summary accumulations. Gold grades have been adjusted from g/m3 to g/t accordingly. Contained gold estimates are not affected

4 any minor discrepancies for sums in the table are related to rounding

5 Sukhoi Log Mineral Resource estimate is as at 31 January 2017