Stocks & stats Back
En Ru
  • Gold (USD) 1,217.50 +14.50
  • MOEX (GBX) 6,448.02 +48.62
  • OTC (USD) 29.59 0.00
1,763 koz of gold
produced in 2015 (2014: 1,696 koz)
424 $/oz
Total cash cost
610 $/oz
All-in sustaining cash cost
Ore processed, kt
22,743 2014
24,740 2015
Adj. EBITDA $ mln
1,011 2014
1,268 2015
6 6 operating assets: 5 hard-rock mines and alluvial operations
2,189 $ mln
Total Revenue in 2015
0.08
Lost time injury frequency rate (LTIFR) per 200k hours worked in 2015 (2014: 0.09)
Factsheet
Panimba and Razdolinskaya
Krasnoyarsk region, Eastern Siberia, Russia
5.82 millionMeasured, Indicated an Inferred Mineral Resources (ounces)

Located in a close proximity to each other, these two deposits have similar types of ore, and are, therefore, considered as one project. At the initial stage, oxidised ores from Panimba and Razdolinskaya are planned to be processed at a heap-leaching facility. The next stage of the development involves the testing of sulphide ores from both deposits using pressure oxidation and/or bio-leaching technologies.