  • Gold (USD) 1,168.90 -2.15
  • MOEX (GBX) 5,557.65 +6.25
  • OTC (USD) 29.59 0.00
1,763 koz of gold
produced in 2015 (2014: 1,696 koz)
424 $/oz
Total cash cost
610 $/oz
All-in sustaining cash cost
Ore processed, kt
22,743 2014
24,740 2015
Adj. EBITDA $ mln
1,011 2014
1,268 2015
6 6 operating assets: 5 hard-rock mines and alluvial operations
2,189 $ mln
Total Revenue in 2015
0.08
Lost time injury frequency rate (LTIFR) per 200k hours worked in 2015 (2014: 0.09)
Factsheet
Kuranakh
North-Eastern Siberia, Russia
Mining type

Conventional shovel-and-truck open-pit operation

2015 production
2014 production
3.8 mtpaProcessing capacity
2.4 millionProven and Probable Reserves (ounces)
4.7 millionMeasured, Indicated an Inferred Mineral Resources (ounces)
1,844Employees

Located in North-Eastern Siberia, Kuranakh is a steady-stage medium-sized open-pit operation that has been in production for over four decades. The mine currently operates at the rate of 3.6 mln tonnes of ore per year.