OJSC Polyus Gold (RTS, MICEX and LSE – PLZL), Russia’s leading gold producer, today released the production results for 1H 2008. During the first six months of 2008 Polyus Gold produced 17.4 tonnes (559 k oz) of refined gold compared to 14.6 tonnes (470 k oz) during the same period last year.  This almost 20% increase was achieved due to the following:

  • Enhanced production at Olimpiada mine in Krasnoyarsk region relating to the commissioning the new sulfide ore processing plant - Mill-3;
  • Putting into processing additional oxide ore, which was operationally accreted in Vostochny pit of Olimpiada mine;
  • Putting into processing ore from Olenie deposit, which was mined in 2007.

During the period under review Polyus Gold’s production units mined 3 286 k tonnes of ore, compared to 5 667 k tonnes in H1 2007. Ore processed in 1H 2008 amounted to 4 994 k tonnes compared to 4 614 k tonnes last year.

In the 1H 2008 the total volume of drilling in frameworks of exploration activity amounted to 100.5 km. During the last several years the Group was involved in large-scale exploration works in all areas of Polyus Gold’s operations. Already in July 2008 Group’s total proved and probable (P&P) reserves base reached 72.3 million ounces of gold (5th place in the World), which led to early execution of the company’s strategy on P&P reserves base building-up.

According to preliminary estimations, the company’s revenue in accordance with IFRS (unaudited) in 1H 2008 amounted to USD 508 million, comparing to USD 309 million in 1H 2007 (audited). More than 60% growth in revenue is a result of enhanced production and gold sales, as well as increased gold price and the company’s non-hedging sales policy. In 1H 2008 the Company sold all refined gold it produced. Thus, the Group’s refined gold sales volumes for the period amounted to 17.4 tonnes (559 k oz) compared to 14.6 tonnes (470 k oz) for the same period of last year. The weighted-average price of gold sold grew from USD 659.7 in 1H 2007 to USD 908.7 in 1H 2008.

Polyus Gold 1H 2008 Operating Highlights

 

1H 2008

1H 2007

FY 2007

Ore mining (in ‘000 tonnes or as noted)

 

 

 

Olimpiada mine

Mining of ore
Oxidized ore
Sulfide ore
Ore from Olenie deposit

 

 

-
599
261

 

834
2 290
-

 

928
3 545
-

 

860

3 124

4 473

Average gold grade (g/tonne)

 

 

 

Oxidized

-

14.1

14.2

Sulfide

3.5

5.4

5.3

Ore from Olenie deposit

3.1

-

-

Kuranakh mine

 

 

 

Mining of ore

1 945

2 151

4 154

Average gold grade  (g/tonne)

1.3

1.4

1.4

Zapadnoye mine

 

 

 

Mining of ore

480

392

750

Average gold grade  (g/tonne)

1.8

2.0

2.0

Total ore mined

3 286

5 667

9 377

 

 

 

 

Ore processing (in ‘000 tonnes or as noted)

 

 

 

Olimpiada mine

Processing of ore
Oxidized ore
Sulfide ore
Ore from Olenie deposit

 

414
1 864
647

 

741
1 731
-

 

1 458
4 773
-

 

2 924

2 472

6 231

Average gold grade (g/tonne)

 

 

 

Oxidized

14.6

9.5

10.5

Sulfide

4.1

3.4

3.5

Ore from Olenie deposit

5.7

-

-

             Recovery (%)

 

 

 

Oxidized

96.9

95.5

95.4

Sulfide

69.0

82.2

75.9

Ore from Olenie deposit

82.7

-

-

Kuranakh mine

 

 

 

Ore processed at the mill

1 826

 1 858

3 905

Average gold grade (g/tonne)

1.4

1.4

1.4

Recovery (%)

84.7

86.4

85.6

Zapadnoye mine

 

 

 

Ore processed

244

284

518

Average gold grade (g/tonne)

2.2

2.3

2.2

Recovery (%)

76.0

73.0

72.7

              Total ore processed

4 994

4 614

10 653

Alluvial deposits

 

 

 

Sands washed (million cubic meters)

2.1

2.5

9.1

Average gold grade  (g/ m3)

0.6

0.6

0.6

 

 

 

 

Gold production (k oz)

 

 

 

Olimpiada mine

449

347

861

Kuranakh mine

68

69

142

Zapadny mine

11

16

32

Alluvials

31

37

179

Total gold production1

559

470

1 214

Note: 1 – The total gold production of the Group include insignificant volumes of the metal obtained as a result of waste clean-up at non-operational Nezhdaninskoye Mine.

Olimpiada mine (Krasnoyarsk region)
Refined gold output at Polyus Gold’s key production unit, Olimpiada Mine in Krasnoyarsk region, amounted to 14.0 tonnes (449 k oz) in 1H 2008, compared to 10.8 tonnes (347 k oz) for the same period last year. Enhanced production at Olimpiada mine is relative to the commissioning of new sulfide ore processing plant - Mill-3. This largest sulfide ore processing plant in Russia with a capacity of 5 million tonnes of ore per year was commissioned in July 2007. Besides this, increase in production was also achieved by putting into processing additional oxide ore, which was operationally accreted in Vostochny pit of Olimpiada mine, as well as by putting into processing ore from Olenie deposit, which was mined in 2007.

Blagodatnoe and Titimukhta deposits (Krasnoyarsk region)
In the first six month of the year 2008 the company was actively developing new projects in the Kraskoyarsk region. In frameworks of Blagodatnoe project development the company built camp for 987 workers, it was involved in construction of hydrometallurgy housing, main building, chemical agents’ storage, spare parts and materials depot, high-voltage substation. The company was involved in development of the pit for coal power station, power grid, roads, water pipe and water intake facility. In frameworks of Titimukhta project development the company already constructed the road and the power grid of 7 km length, was involved in construction of the pit for high-voltage substation and crushing plant. Several units of mining equipment were delivered for the project of Titimukhta.

Kuranakh mine (Republic of Sakha (Yakutia))
Kuranakh mine in the Sakha Republic (Yakutia) produced 2.1 tonnes (68 k oz) of refined gold in the first six months of 2008, compared to 2.1 tonnes (69 k oz) for the same period last year. This insignificant reduction in production was caused by lower grades in the ore mined. Currently the company modernizes mill to increase its capacity from 3.6 million tones of ore per annum to 4.5 million tones of ore per annum. Main works on modernization to be completed by November 2008.

Zapadnoye mine (Irkutsk region)
Refined gold production at Zapadnoye Mine in H1 2008 amounted to 0.4 tonnes (11 k oz), compared to 0.5 tonnes (16 k oz) in the same period last year.

Alluvials (Irkutsk region)
Refined gold production at alluvial deposits in Irkutsk region in the first six months of 2008 amounted to 1.0 tonnes (31 k oz) of gold compared to 1.1 tonnes (37 k oz) in the same period last year.

Verninskoe deposit (Irkutsk region)
In the first half of 2008 the company was constructing main building, boiler house and camp for the project of Verninskoe. For this project the company ordered hardware, plant equipment and drilling rigs.

Polyus Gold is the largest gold producer in Russia. Headquartered in Moscow, Polyus Gold’s operating mines and development/exploration projects are located in five major gold mining regions of Russia - Krasnoyarsk, Irkutsk, Magadan, Amur regions and the Republic of Sakha (Yakutia). The company produced 1.2 m oz of gold in 2007.

For further information please contact

For investors:
Alexey V. Chernushkin, Director, CM and IR
Evguenia V.Buydina, IR manager
 +7(495) 641-3377 
 +7(495) 785-4031 
ir@polyusgold.com

For press:
Victoria V. Vergelskaya, PR Director
Elena D. Evstigneeva, Media Relations
 +7 (495) 641-3365 
 +7 (495) 544-5496 
pr@polyusgold.com